Permit Applications

Applications submitted through the Maitland Online Permitting system will need to include a completed application. To avoid any delays in processing, applicants are required to complete, sign and upload the applicable Permit Checklist (document should be uploaded and named AC.pdf) with our online permit application. You can download the required checklist (and other forms, if applicable) by clicking on the proper checklist link below. If you are unsure of the type of permit(s) you need to submit, you please visit our Selecting Your Permit Type page or contact a Permit Specialist at (407) 539-6150.

PERMIT-SPECIFIC CHECKLISTS/APPLICATIONS/AFFIDAVITS/FORMS


The following documents are required to be uploaded only as applicable to the permit-specific application. By completing and signing the appropriate checklist, you are attesting that the information marked has been submitted in your online permit application submittal. Please note, unsigned, incomplete or missing information (without justification) noted on the checklist may cause delays in processing your permit.

CHECKLISTSAPPLICATIONS/AFFIDAVITS/FORMS
New Commercial (including addition) Building Checklist APPLICATION
New Residential (including addition) Building Checklist Special Event Permit
Building Alteration (Commercial or Residential) Checklist AFFIDAVITS
Chicken Keeping Permit ChecklistOwner/Builder Affidavit
Demolition Permit ChecklistPool Affidavit
Driveway Permit Checklist Gas Pressure Test Affidavit
Electrical Permit ChecklistPrivate Provider Services Affidavit
Fence/Wall Permit Checklist Re-roof Affidavit
Fire Permit (Alarm, Sprinkler or Protection) Checklist Re-pipe Affidavit
Foundation Permit Checklist FORMS
Gas Permit ChecklistChange of Contractor Form
Generator Permit ChecklistResponse to Comments Form
Mechanical Permit ChecklistPermit Revision Form
Plumbing Permit Checklist Hold Harmless Letter
Pool Permit ChecklistLimited Power of Attorney Form
Roof Permit Checklist FDEP Demolition or Asbestos Renovation
Right-of-Way Utilization Permit ChecklistRequest Cancellation of Issued Permit Form
Short-Term Rental Permit ChecklistApplication for Building Code Variation
Sign Permit (Permanent) Checklist Professional Signature Submittal (PSS) Form
Sign Permit (Temporary) Checklist Paver Letter (pavers within the right-of-way)
Site Construction Permit Checklist
Streamlined (eligible permits only) Permit Checklist
Waterfront Structure Permit Checklist

NOTICE OF COMMENCEMENT (NOC)

All permits valued over $2,500.00, will also need to upload a Notice of Commencement (document should be uploaded and named NOC.pdf) with the exception of mechanical permits which are required if the value exceeds $7,500.00. Please note, as if July 1, 2022, HVAC contractors are not required to provide an NOC if the value of work is under $15,000.00 and as of October 1, 2023, all other permits are not required to provide an NOC if the value of work is under $5,000.00.

PLANS/DOCUMENTS PREPARED BY A SURVEYOR, ARCHITECT, ENGINEER OR LANDSCAPE ARCHITECT


Plans and documents required to be signed and sealed by a licensed surveyor, architect, professional engineer or registered landscape architect will need to download a copy of the Professional Signature Submittal (document should be uploaded and named PSS.pdf), complete and sign/seal the form and mail it to the address indicated on the form with each submittal (initial and all revisions). No permit will be released until the PSS form is received.

Starting August 1, 2023, submittals under the purview of the Florida Building Code and the Florida Fire Prevention Code can be submitted with a “Digital” signature and seal from the Design Professional; “Electronic” signature and seals cannot be accepted by our system. The plan files must have their permissions set to “Restricted” which will allow for Maitland to properly comment/stamp/approve the individual sheets as deemed appropriate. The concerns of supporting documentation being properly sealed, i.e. Florida product approvals, manufacturer installation instructions, and manufacturer NRTL Listing/Labeling information, does not apply. For more information on the electronic plan submittal/resubmittals, including the any new requirements, please refer to our Building Safety and Permitting page .

USING A CONTRACTOR AND/OR SUBCONTRACTORS?


All contractor information must be up to date with the City. If your contractor(s) have not done work in Maitland within the past 12 months, you will need to verify their information is up to date or provide the updated information such as general liability and workers compensation insurance, license information and business tax receipt.

You can update Contractor Certifications through our CSS Permitting Interface. You will click on “Apply” in the black bar across the top, then under “Licenses” you will click on “Contractor Registration”. Follow the prompts to submit the updated contractor’s certifications. For questions, please contact our office at (407) 539-6150.

IMPACT FEE INFORMATION

To expedite this calculation, the City requests that an “Impact Fee Assessment” table is provided on the submitted plan sets for review with the following information: